    Marathon runners take no breaks.

    Marathon runners take breaks between every marathon. Runners can require nearly a month of downtime between races in order to perform optimally.

    How do you think tradesman handle working 8 hour shifts with only a 30 minute break?

    So yes, it is in fact wasted.

    Resting isn’t wasted time any more than sleeping is.

    • SchmidtGenetics@lemmy.world
      link
      fedilink
      arrow-up
      2
      arrow-down
      17
      ·
      5 hours ago

      Right, but they handle the full shift of their duties in that time, and get their REST after. They get no breaks.

      Thank you, that’s a union job, makes my point quite well, other tradesman would be canned for doing that. They can go a full shift without breaks.

      Resting and breaks are wholefully different things. Everyone needs rest between shifts, but if you can’t perform your shift without breaks, why are you there?

      • UnderpantsWeevil@lemmy.world
        link
        fedilink
        English
        arrow-up
        5
        arrow-down
        3
        ·
        5 hours ago

        Thank you, that’s a union job

        That’s just a job. If you think people are working harder without a union, you’d be surprised. More often they’re being paid less to do less work, because the workers aren’t trained by their veteran peers to manage themselves.

        The suffocating bureaucratization of the corporate world tends to make work sites more difficult and dangerous to navigate, tires people out more quickly, and ends up with exactly this kind of “six guys staring at a hole in the ground while one guy works” dynamic - because corporate only delegated one shovel for six people, to save money.

        • SchmidtGenetics@lemmy.world
          link
          fedilink
          arrow-up
          2
          arrow-down
          11
          ·
          5 hours ago

          ends up with exactly this kind of “six guys staring at a hole in the ground while one guy works” dynamic - because corporate only delegated one shovel for six people, to save money.

          Nope.

          Each one has their role, and can’t start till the one before is done. But it’s too difficult to coordinate and people don’t like sitting around at home not being paid. So they just pay everyone to stand around. Or the job would take 2 weeks instead of a week, but things have to get done “fast”.

          It’s why union jobs cost 10x as much as private, and do the exact same job.

          On a normal jobsite, the plumber could dig his own hole, and sweep up after, but now that’s 3 different jobs done by 3 different people and different rates as well.

          • UnderpantsWeevil@lemmy.world
            link
            fedilink
            English
            arrow-up
            4
            arrow-down
            2
            ·
            5 hours ago

            Each one has their role

            But they can’t perform their work efficiently, because of the artificial constraints imposed by the business. I’ve worked these jobs and I’ve seen the tight-fisted nature of corporate drag a job out needlessly for months on a number of occasions.

            It’s why union jobs cost 10x as much as private

            They don’t cost 10x as much. They cost maybe 10-20% more, but with much thinner margins, because the workers get a bigger cut of the gross revenues. So you tend to see unions employed in bigger and more professional tier projects, where failure costs far more than some angry retail sucker giving you a bad Yelp review.

            On a normal jobsite, the plumber could dig his own hole, and sweep up after, but now that’s 3 different jobs done by 3 different people

            There’s no such thing as a single “normal jobsite”. You have different levels of job and different requirements for the job. On a new build, you can have multiple professionals working simultaneously if they’re well-managed. Or you can have a bunch of apprentice-tier dorks waiting in line to do the next task, because the project manager is a paint-by-numbers guy taking instructions from some master planner that isn’t on site.